Skip to content
SediLogic Technologies

Wastewater lagoons

Dairy manure lagoon

A floating crust around a foot and a half thick, stiff enough to interfere with pumping the lagoon down for land application.

87%

reduction in crust thickness

Field result
Duty
Wastewater lagoons
Sector
Agricultural
Treatment window
4 weeks
What was counted
Sludge depth and solids
  • Pumping for land application reported as easier
Aerial view of a multi-cell aerated wastewater lagoon, its surface broken by aeration, with grass berms dividing the cells and a small control building alongside.
Illustration — an operating aerated lagoon, not the works described on this page.

01The plant

What was being treated

A dairy manure lagoon of about 5 million gallons.

02Before

How the material got there

A floating crust around a foot and a half thick had formed over the lagoon, stiff enough to make pumping down for land application difficult.

03Treatment

What was applied, and how

A single high-strength treatment over four weeks, applied to roughly a third of the lagoon rather than the whole surface.

Every result in this library was measured at an operating plant treating with one of the formulations SediLogic supplies, over the window stated above. It is a field result published as reported, not a controlled trial we ran.

04Sizing

What the quantity was set against

A localised charge against the treated third rather than a rate across the whole lagoon — which is why this record is not a guide to dosing a lagoon of this size.

05Outcome

What followed

Pumping for land application was reported as easier once the crust broke down.

At the start

A floating crust roughly 18 inches thick, difficult to pump.

At the close

Crust down to about 2 inches, liquefied enough to pump for land application.

06Limits

What this record does not establish.

Only a third of the lagoon was treated, and the record does not say whether the untreated remainder was measured — so the closest thing here to a comparison was not used as one. No laboratory analysis, no method for measuring crust thickness, and no facility or location are recorded. An 87 per cent reduction in a floating crust is not the same measurement as a reduction in the settled accumulation below it.

Only the volatile organic fraction of a sludge responds to any of this. Grit, sand, silt, mineral precipitates and plastics remain at any dose, here and everywhere else.

What we would supply

For this duty, in our range.

Spike and Puck are sinking solids for bottom sludge. Maintain is a soluble pouch for organic load in the water column, with Polar for cold-water conditions. The planner calculates quantities only for products with a written dose method; Puck and Polar need a separate review.

Use the written dose method for your product and lagoon. A quantity reported in a case study was chosen for that site and should not be used as your application rate.

Read next

The same duty, measured somewhere else.

  • Wastewater lagoons

    Barbourville, Kentucky

    Municipal24 weeks

    43.3%

    of accumulated solids digested

    Field result

    Just over five feet of accumulated solids in the primary aerated lagoon, assessed at 2,365 dry tons. The plant wanted a route that did not involve dredging.

    • 1,025 dry tons removed
    • Average depth 5.08 ft to 2.65 ft
    Sludge depth and solids
  • Wastewater lagoons

    Inkom, Idaho

    MunicipalFive months, May to October

    48%

    reduction in solids volume overall

    Field result

    Accumulated solids across two lagoon cells, against a specification calling for a 50 per cent reduction. The treatment window was bounded by water temperature, which has to stay above roughly 55°F for the organisms to work at all.

    • Cell 1: 75.2 per cent
    • Cell 2: 37.5 per cent
    Sludge depth and solids
  • Wastewater lagoons

    Municipal WWTP, United States

    Municipal3 months

    672,659lb

    of organic solids digested

    Field result

    Decades of loading had taken the lagoon to a measured 20.5 per cent solids, with a dredging quotation in hand and no budget line to meet it.

    • Dredging deferred, not ruled out
    • A 4.5x cost saving against the dredging quotation
    Sludge depth and solids

All field results

Your lagoon next

This was measured somewhere else.

This result came from a different plant. Your sludge composition and operating conditions need their own assessment. Send us your lagoon details for a dosing review; do not use the quantity on this page as your application rate.