Aeration basins
Dairy processing plant, 1.9 MGD
IndustrialImprovement inside 4 months
reported annual saving once settling recovered
Nine months of filamentous growth had taken the settled-volume test above 980 ml/L, so the clarifier could not hold solids and the plant was paying to haul them away.
- $110 a day of disposal cost avoided
- Influent BOD around 500 mg/L on 7,192 m³/day
- No closing settled-volume figure was recorded