Collection systems
Municipal sewer line
MunicipalOngoing
between scheduled clean-outs
A line that needed clearing every two months to stay ahead of grease accumulation.
- Dosed from a slow-release block rather than a metering pump
- The upstream section of the same line was left untreated

